Conveyor drum herringbone rubber pulley lagging
About Us:
1. Factory with 15 years experience in producing various types of pulley lagging
2. Advanced production line and testing machine
3. ISO9001:2015, 14001:2015, 45001:2018
4. We also provide pulley lagging service on mine site or at pulley manufacturer.
Types of Pulley Lagging
Ceramic pulley lagging
Rubber pulley lagging, diamond pattern or plain surface
Replaceable pulley lagging
Polyurethane drum lagging

Ceramic Rubber Lagging

Features of Cerami pulley lagging
Aluminum Oxide |
95% al2o3 |
Ceramic Hardness(Mohs) |
> 9t |
Working temperature |
≤85 C |
Rubber Hardness |
60±5 Shore A |
Tensile strength |
19 MPa |
With cn bonding layer or as request. |

Rubber Pulley Lagging Sheet
QA/QC
We have professional labs with all necessary equipment, such as Moving Die Rheometer, universal testing machine, roller grinding machine, megger, ageing oven, alcohol blast burner, ceramic analysis apparatuses, etc.
The raw material, semi-finished products and final products will all be tested.
Each batch of raw materials will be inspected and tested. Rapid tests are carried out for each batch of rubber compound to ensure rubber properties. We take samples from finished pulley lagging sheets via the samples taking machine to test the tensile strength, elongation, aging, electrical resistance, wear loss, etc.
The Mettler Toledo Ingredient Scale is used to make sure that the ingredients are accurate.
Zero defect management to inspire the workers to pay much attention to quality and avoid defectives. The Quality Awards are settled to award the workers, and for those who have zero defective product, their salaries will be increased by 20%.
Three inspection system is used to ensure the quality: self-inspection, mutual-inspection and special-inspection.
-The first-piece inspection and enough in-process inspections will be done by the operators. Defective products should be treated and placed separately.
And the workers are required to fill in and sign the inspection record cards.
- Sampling the semi-products from last procedure.
Mutual-inspection must be done when the workers change shifts.
The engineers and group leaders will do sampling inspection during the production.
- Professional QC staffs are employed to inspect the complete production of pulley lagging sheets, from rubber compound to vulcanization. Detailed records are filed so that the products can be traced.
- We have over 20 pulley lagging installation staffs who have been trained rigorously and have extensive experience. All pulley lagging services shall strictly follow the Installation Instructions and will be recorded.
Cold-Bond Pulley Lagging Installation Instructions are available as per request.